8/28/2017 Horstmann Electronic 7 Manual Series 2 streaming in english with english subtitles in 4K 21:9Read NowCenturion (A4. 1) Main Battle Tank (MBT)The Centurion Mk IThe new design took the base 5- wheel suspended track system of the original Comet cruiser tank. The Comet was a relatively new design entering service only in 1. Korean War. She was produced by Leyland Motors Ltd to the tune of 1,1. However, the tracked component of the Comet for the purposes of a new design was further extended to include a sixth road wheel and the original Christie suspension system was dropped in favor of a Horstmann suspension system. The coil- spring based Horstmann system saw its origins in an original British 1. Sidney Hortsmann. An all- new hull was affixed between the track installations that was specifically designed in such a way as to help with ballistics protection against the newer threats of the modern battlefield. Main armament would come from the proven 1. British 7. 6. 2mm) main gun. Interestingly, the designers fitted a 2. Polsten cannon as secondary armament. Brand/Manufacturer List - manualnguide.com. Manual & Guides - Product User Manuals & Troubleshooting Guides. Products and names mentioned are the property of.Direct Trade Supplies are electrical wholesalers and suppliers of high quality electrical components at great prices, based in the South West of the UK. FREE Delivery on Selected products and orders over £75 + VAT. If under it'll be £2.49 + VAT(Royal Mail) or £5.25. Revolutionise any installation with a range of wireless thermostats and heating controls from Plumb Center. Find out more and shop wireless heating online. MRO INDUSTRIAL More than 7000 manufacturers for MAINTENANCE - REPAIR - OPERATIONS UNITECUNITECUNITECUNITEC----DDDD GERMANYGERMANYGERMANYGERMANY Leipziger. The Polsten series was a cheaper - yet still effective - Polish- designed version of the excellent Swiss 2. Oerlikon series cannon. To ensure excellent performance for the weight, the aircraft- based Rolls- Royce Merlin liquid- cooled V1. Rolls- Royce Meteor powerplant. The Rover Company handled production of this new engine (later becoming the Leyland Motor Corporation) for the new British tank. The Centurion Mk IIWhile construction of the original 4. View and Download Horstmann HRT3 installation instructions online. HRT3 Thermostat pdf manual download. The early pilot (prototype) vehicles emerged as 4. These early forms were armed with the aforementioned 1. Production of the Centurion Mk I proved quite limiting however for the improved and uparmored Centurion Mk II was soon unveiled, this version with a cast turret. The Centurion Mk II promised better battlefield protection through use of more armor and serial production from a 8. November of 1. 94. Production would be handled out of several British factories. The Centurion was formally accepted into British Army service in December of 1. Royal Tank Regiment. The Centurion Mk IIIBy the time the Centurion Mk II was finding its footing in the British inventory, the Centurion Mk III was developed thanks to the arrival of the new 2. Royal Ordnance Factory. The addition of the more powerful weapon rendered the original Polsten 2. Centurion designs moot and these were therefore replaced by a Besa tank machine gun instead. The Centurion Mk III was also a major upgrade to the preceding Mk IIs for it fitted a fully- stabilized gun control system for . A new engine with more power was introduced as was a new improved gunsight. Production of the improved Mk IIIs commenced in 1. Once in service and in available numbers, the Mk III was quick to replace the essentially outmoded Mk I and Mk II marks. Surplus Mk Is and Mk IIs then became subject of upgrade programs to Mk III standardization or converted into useful battlefield engineering vehicles to serve the new Mk IIIs and other heavy armored vehicles. A series of one and two channel time controllers with independent heating and hot water control and three switching. A Python Edition is now available from the Karel J Robot site at Cafe Press. It is somewhat different, since Python is somewhat different. It tries, as all of these. The original Centurion Main Battle Tank (A41) of 1945 was a hugely successful British Army initiative enacted during World War 2 and realized shortly after the. The Centurion Receives the L7 1. Main Gun. While the new 8. Centurion was not done with its metamorphosis in becoming one of the finest tank weapons in the world. The Royal Ordnance Factory completed work on the all- new, revolutionary 1. L7 rifled main gun which promised improved firepower through better penetration values than all other preceding British tank guns. The 1. 05mm gun system was then quick to replace the 8. Centurion production examples. The Centurion Mk 7 soon emerged with the L7 in place as production commenced and these were followed by the Mk 8/1 and Mk 8/2. In all, thirteen major Centurion marks would ultimately exist. Centurion Variants. Centurion Mk I marked the early 1. The Mk II was fielded with its fully- cast turret. The Mk III was first given the newer 8. L7 gun with gun stabilization and new sights. The Mk IV existed as a proposed close- support model fitting a 9. CS howitzer cannon but never entered serial production. The Mk V/Mk 5 was the first to feature Browning machine guns at the coaxial and commander's cupola positions. Stowage bins along the glacis plate were also introduced with this mark. The Mk 5/1 brought about an increase to glacis armor thickness as well as introducing 2 x coaxial machine guns. One was a typical 7. The Mk 5/2 utilized the 1. L7 main gun. The Mk 6 was an uparmored version of the Mk 5 with the 1. L7 main gun in place. The Mk 6/2 sported a ranging gun for improved accuracy. The Mk 7 saw its engine compartment rood redesigned. The Mk 7/1 was nothing more than an uparmored Mk 7 while the 7/2 was an upgunned Mk 7 (1. L7). The Mk 8 was given a new mantlet and revised commander's cupola. The Mk 8/1 sported more armor and the Mk 8/2 was fitted with the 1. L7 main gun. The Mk 9 was an uparmored Mk 7 with the 1. L7 main gun. The Mk 9/1 fitted infra- red equipment while the Mk 9/2 sported a ranging gun. The Mk 1. 0 was an uparmored Mk 8 with the 1. L7 main gun. The Mk 1. The Mk 1. 1 was an Mk 6 model with the ranging gun and infrared equipment. Similarly, the Mk 1. Mk 9 model with the ranging gun and infrared support. The Mk 1. 3 was an Mk 1. Armored recovery vehicles were designated as Centurion ARV (Mk I and Mk II) while the Centurion Ark (FV 4. Centurion AVLB (Dutch Army service) as was the Centurion Bridgelayer (FV 4. The Centurion AVRE 1. AVRE 1. 65 were combat engineering vehicles each armed with a 1. The Centurion BARV was a . Other British Army variants further expanded the Centurion family line. Centurion Global Operators. Complete operators of the Centurion main battle tank (beyond the British Army) became Australia, Austria, Canada, Denmark, Egypt, India, Iraq, Israel, Jordan, Kuwait, Lebanon, Netherlands, New Zealand, Singapore, Somalia/Somaliland, South Africa, Sweden and Switzerland. The Centurion Oliphant of South Africa. The Centurion was rebuilt in South Africa with French assistance (due to a 1. UN military embargo on the African nation) as the . First versions appeared in 1. Semel with a 8. 10hp engine. The primary versions then became the Olifant Mk I of 1. Olifant Mk 1. A of 1. Olifant Mk 1. B of 1. Olifant Mk 2 (new turret and fire control system, 1. To date, the Olifant is still considered the most advanced combat tank on the African continent - and few could argue that. South African weapons engineers had made a habit of modernizing existing systems into more potent forms - even in the face of imposed sanctions on weapons and technology. The Centurion Sho't of Israel. The Israelis designated their Centurions as the Sho't. This included the Sho't Meteor to signify this Mk V's use of the original Rolls- Royce Meteor engine and several modernization attempts that spawned the Sho't Hal Alef, Bet, Gimel and Dalet. The Nagmashot, Nagmachon and Nakpadon were armored personnel carrier conversions of the base main battle tanks. The Puma designated combat engineering vehicles while the Eshel ha- Yarden was a proposed Centurion development fitting 4 x 2. Swedish Centurions. The Swedish Army operated the Centurion under its own in- house designations as the Stridsvagen 8. R, 1. 02, 1. 02. R, 1. The Bargningsbandvagn 8. Centurion: Ultimate War Tank. The Centurion series went on to become one of the most successful Cold War tank designs in the history. British allies were quick to take the excellent post- war tank into their inventories and the tank - once in action - did not disappoint. The British Army themselves fielded their Centurions for the first time in the Korean War (1. UN actions against the communist North Korean invasion into the South and against subsequent Chinese involvement in the theater. The Centurion saw further deployment in the Suez Crisis of 1. Indo- Pak War of 1. Indian Army), the Six Day War fighting for both Israel and Jordan, the Liberation War of Bangladesh of 1. Indian Army), the Yom Kippur War for both Israel and Jordan, the Vietnam War with the Australian Army, in the Angolan Civil War (South African Army), Operation Motorman (British Army anti- IRA operations in Northern Ireland), the Falklands War of 1. BARV example only) and in the 1. Gulf War during Operation Desert Storm (AVREs with the British Army). British Centurions in the Korean War. After North Korea invaded South Korea in 1. Korean War on the Korean Peninsula, the Centurion was called into play with the 8th King's Royal Irish Hussars of the British Army fighting under a coalition UN force. While the air war was of particular historical note - it featured the first aerial combat between jet fighters - the war would still be hard fought on the ground across unforgiving terrain and environments. Three Centurion squadrons arrived at Pusan and were forced to operate in the Korean temperature extremes - particularly the cold, frozen winters that created havoc on most any mechanical device. At least five Centurion tanks were lost in the retreat of friendly forces during the Battle of Imjin River but the tanks proved critical in providing cover for friendlies. By the time the UN had recovered from the North's invasion and pushed back across the 3. Parallel, the Centurion was put up against the Chinese who had become involved on the side of the beaten North. In either case, the Centurion left a positive and lasting impression of her first true combat involvement and made a name for herself for decades to come as a proven, go- anywhere main battle tank system in the new age of modern warfare. Australians, Centurions and the Vietnam War. During the Vietnam War, the Centurion was called into combat but this time with the Royal Australian Armored Corps. After their American- made M1. Vietnamese jungles, the Australian government committed their powerful Centurion tanks into the fray. Centurion tanks with their 8. February of 1. 96. After some practice, the side armor skirts were removed to prevent the buildup of torn vegetation and mud on the tank tires. External fuel stores were also added to help increase cross- country operational distances. Success found Centurion crews once more as Australian combined actions with supporting infantry netted at least 2. Coral and Balmoral. WARMFLOW COMBI 7. INSTALLATION & SERVICING INSTRUCTIONS MANUAL Pdf Download. INSTALLATION & SERVICING MANUAL FOR 7. COMBI BOILER & 7. KABIN PAK COMBI LEAVE THESE INSTRUCTIONS WITH THE END USER BS 5. PART 2 ISO 9. 00. NATIONAL ACCREDITATION OF CERTIFICATION BODIES CERT. FM 2. 98. 84.. SERVICING To ensure continued reliable operation and fuel economy it is recommended that the boiler is serviced annually. Warmflow Engineering Service division provides an excellent back- up service, operating a team of Oftec trained engineers who can meet all the servicing, commissioning and breakdown requirements for your appliance. The hardness of the mains water supply. Systems with hard water must be fitted with a suitable chemical scale preventer (eg Fernox Quantomat or Combimate alternatively contact Warmflow for further details). That the flow from any one hot water outlet does not exceed the maximum recommended. Contents Page User Instructions ............. Introduction ............. General Requirements .......... Components............ Technical Details ............ Sequence of Operation Flow Chart........ Baffles ............. General Requirements .......... Dimensions ............. Combi Flue Options .......... Technical Data ........... User Instructions 1. Boiler Control Thermostat The boiler control thermostat is located on the front of the boiler facia panel and may be adjusted from 5. The recommended minimum thermostat setting is 6. Below this . However to comply with building regulations only kerosine may be burned when using the low level balanced flue or low level conventional flue. Components 1. 3. 1 Combi Assembly Automatic Air Vents Filling Loop Boiler Heat Exchanger Tank Control and Limit Stat Boiler Control and Limit Stat Flow Switch 1. Litre Esxpansion vessel Mixer Valve Boiler Data Plate Plate Heat Exchanger RDB Burner CH Pump Head Boiler Drain Valve DHW Pump Head Pressure Relief Valve.. Kabin Combi Assembly Flue Terminal Guard Door Panel 1. Air Intake Grill Low Level Flue 1. Burner Reset 1. 8. Pipe Access Hole Service Access Hatch 1. Burner Reset Button 1. Plate Heat Exchanger Control Panel Cover 1. Mixing Valve Controls 1. Technical Details Sequence of Operation Flow Chart Power Timer Calling For Heat Selected Flow Switch Closed Pump Only Runs Tank Stat Satisfied Burner Limit Stat Selected Stops Tripped Room Boiler Press Stat Limit Stat Reset Satisfied Tripped Button CH Pump Burner Only Runs Fires.. General Requirements The Warmflow Combi is supplied with all the necessary components for a sealed heating system. However, on some larger systems with a total water content greater than approx 1. L, an expansion vessel, in addition to the integral 1. L vessel supplied, may be required. Dimensions 2. 4. 1 Combi Dimensions MODEL 7. Combi Boiler Connections 1. REAR VIEW All dimensions are given in mm. Cold Mains (1. 5mm) Pressure Relief Discharge (1. Heating Flow (2. 2mm) Spare Connection (1” BSP) Domestic Hot Water (2. Central Heating Return (1” BSP) Page 9.. Kabin Pak Combi Dimensions MODEL 7. Combi Flue Options (not applicable to the Kabin Pak Combi) Note: Low level flue options are rear or left hand outlet only. In order to ensure the safety of the Kabin Pak Combi Warmflow recommends that power to the appliance is supplied through a suitable CE approved RCD trip switch. Combi Wiring Details 3. Wiring Diagram Page 1. Combi Wiring Schematic Page 1. Kabin Pak Combi Wiring Details 3. Kabin Pak Combi Wiring Diagram Page 1. Kabin Pak Combi Wiring Schematic Page 1. Frost Thermostats 3. Combi Boilers The switched live from the frost thermostat (the frost thermostat must be supplied by a permanent live) should be connected to number 5 on the boiler terminal block. In order to protect the fabric of the building as well as the boiler and pipework, the thermostat should be located in the coldest part of the house but where it can respond to any temperature rise. Timers for Standard Combi Note: Single channel timers or programmers are not recommended. Installation of a remote two channel programmer (option 1) Remove the purple wire connecting 5 and 2. Connect the programmer as shown via a fused isolator. Installation of Warmflow Optional Programmer (not applicable to the Kabin Pak Combi) Disconnect the electrical supply. Remove top casing (4 studs) and control box cover (1 screw). Remove 2 screws securing blanking plate/programmer bracket. Remove bracket and blanking plate from the control panel. Timers for Kabin Pak Combis Note: Single channel timers or programmers are not recommended. Installation of a Remote Two Channel Programmer THE HW AND CH SELECTOR SWITCHES ON THE BOILER CONTROL PANEL SHOULD BE LEFT IN THE OFF POSITION BUT CAN BE USED AS L N E SERVICING SWITCHES TO.. Oil Supply Oil Tank Steel tanks constructed to BS 7. Part 5 1. 98. 7 should be painted on the outside only and mounted on piers to prevent corrosion. Plastic oil tanks are also available and can be suitable for installation at ground level. However, oil should never be stored in translucent plastic containers. Two Pipe System APPROVED 2. PER SITE GAUGE METRE SLOPE WATER SEPARATOR Total Maximum Pipe Length (m) Lift H I. D. 1. 0 mm De- aerator System FIRE VALVE SENSOR DE- AERATOR MAY BE ABOVE OR BELOW BURNER AND MUST BE POSITIONED OUTSIDE APPROVED SITE GAUGE.. One Pipe Lift APPROVED 2. PER METRE SLOPE SITE GAUGE Note: The pump vacuum should not exceed a maximum of 0. Above this gas is released from the WATER oil thus leading to burner lock out. SEPARATOR Total Maximum Pipe Length (m) Lift H ID 8mm ID 1. Flues Conventional Flues The flue should be designed in accordance with the local bye- laws and the Clean Air Act. Draught stabilisers are not recommended for oil fired boilers. Sharp bends or horizontal runs should be avoided and the flue should terminate 2 feet (6. Terminal Position Min Distance Below gutters, soil pipes or drain pipes 1. From a door, window or air vent Above ground, flat roof or balcony level Below eaves or balconies 1. From an internal or external corner From a terminal facing the terminal From a surface facing the terminal Vertically from a terminal on the same wall 1. Air Supply for Combustion and Ventilation (see BS 5. Open Flue Boilers When the boiler is sited in a cellar where the only access for combustion and ventilation air is at high level then the combustion air should be ducted to low level. Combustion Air Supply Boiler in Room Boiler in Compartment.. Installation of Flues Easy Fit High TOP PANEL Level Balanced BLANKING PLATE Flue (HLBF- R) OPTIONAL FLUE DRESSING RING FLUE TERMINAL TOP PANEL OPTIONAL EXTENSION PIECES FLUE GASKET HORIZONTAL FLUE ADAPTOR TEST HOLE PLUG CONVENTIONAL FLUE RING AIR INTAKE ADAPTER Easy Fit Vertical BOILER LID SPIGOT &.. Installation of a Balanced Flue (BF- R, HLBF- R & VBF) Make a suitable sized hole in the wall or ceiling for the flue kit. Add the dimensions given on pages 6 (Dimension G) and 8 (Flue Vertical Dimension). The cavities around the opening must be sealed and protected by a non- combustable sleeve. Installation of Telescopic Low Level Conventional Flue Installation instructions as per the balanced flue except there is only an inner seal, the burner does not require modification and there is no flexible hose to be fitted. In addition the low level flue should only protrude through the wall by a minimum of 1. Installation The boiler installation must be in compliance with BS 5. Part 1 1. 99. 7 and the Building Regulations. Hearth The boiler hearth temperature is between 5. C and 8. 5 C and should be stood on a rigid, non- porous, non- combustible base, which is not softened by warmth to comply with the Building Regulations. Boiler Connections All connections to the appliance should be made with compression fittings. Additional Requirements for a Kabin Pak Combi Although the Kabin Pak is manufactured from galvanised sheet it is recommended that after a period of weathering (approx 4- 8 weeks) that the Kabin Pak is painted with a suitable primer and finish coat to prevent corrosion. It is recommended that a pumped hot water return is used in order to improve HW reaction times. Contact Warmflow for details. Fitting a Vertical Flue Adaptor Remove the 2 self tappers connecting the flue main body to the Kabin Pak and lift off. It may be necessary to break the seal between the flue main body and the top of the flue pipe. Burners RDB Burner The burner is fitted with the correct nozzle and the pressure set. All that is further required before commissioning, is to connect the oil and electricity supply. Pump Air damper adjustment screw Control box Air tube connection (supplied with BF kit) Reset button with lock- out lamp Pump pressure adjustment screw Flange with insulating gasket.. Electrical Connections The boiler control equipment and the burner are provided ex works, it is only necessary to connect a 2. V 5. 0Hz supply in accordance with the electrical drawings. Electrode Setting Attention Before assembling or removing the nozzle, loosen the screw (A) and move the electrodes away from the nozzle. Commissioning and Servicing 1. Commissioning Note: IT IS RECOMMENDED THAT AN OFTEC TRAINED AND REGISTERED TECHNICIAN SHOULD BE USED. IT IS THE RESPONSIBILITY OF THE INSTALLER TO ENSURE THAT THE BOILER IS PROPERLY COMMISSIONED. SEE BS 5. 41. 0. FAILURE TO DO SO MAY INVALIDATE THE WARRANTY. HORSTMANN TIMERS & CONTROLS Ltd: Note: Ensure selection switch on the rear of the NEWBRIDGE ROAD, BATH. The DAY OF THE WEEK indicator will now flash. Use the PLUS(+) or MINUS(- ) buttons to move the DAY OF THE WEEK Indicator to the current day of the week. Adjust the flashing time as required by using the (+) AND (- ) BUTTONS THEN PRESS ENTER. The display will now show . This can be altered in the same way as the . Follow the same procedure for the 2nd and 3rd ON/OFF times remembering to press ENTER after each change to the programme. Hot water ON indicator. Central heating ON indicator. Advance button. Hot water programme select button. Central heating programme select button. Programme positions.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
September 2017
Categories |